Hello Friends and all knowing board:

 

We built our cabin (by a very reputable local builder) in 2005-2006. It originally was going to be a bunkhouse (24x32), but later loved the location (views of both Frazer and Smarts) and decided to put in septic, electricity, etc. We are on a bit of a slope looking out towards Smarts with the cabin supported by numerous footings, the front ones facing the lake being probably 7-8 feet high. Three years ago we had another local builder who lives very close put in a fish house and storage shed. He commented at the time that it appeared that our footings were shifting (slowly over time leaning a touch) a bit and I should probably have our builder take a look. Our original builder wasn't too concerned early on, however, over the years we both agree the shifting has continued to take place and probably should take care of sooner versus later. We are having challenges communicating (he works on very large (and beautiful) cabin projects and probably is just absolutely slammed with his regular work. He originally commented we have three options; cheaper.... resetting footings by putting into original angle , middle cost was reestablishing a new foundation throughout the blue print of the cabin, and then finally doing the long term addition we will likely do in the future (too costly right now).

 

Does anyone know of anyone who would have knowledge on this particular scenario that I could contact to get it fixed/diagnosed? Anyone ever experience a similar scenario?

 

Thanks for any insight friends!

 

Share this post


Link to post
Share on other sites
redlabguy

PSU,

i don’t have help, only sympathy. We have a bunk house with the same issue. Last winter was one of the worst for frost heaving. We have sono tubes (concrete) that are tipping. And this year it went from a concern to more like disaster. We’re going to try to put a new foundation. My local jack of all trades is going to try in August. I know he’s swamped but I’ll mention your situation, too. I’ll let you know and I’ll be interested in your experience.

Dick

  • Thanks 1
  • l Love It 1

Share this post


Link to post
Share on other sites
yoppdk

Sorry not to be able to help either, but also feel your pain in trying to find an able and willing contractor. Our ely cabin built 10 years ago has some issues which I have been trying to get the original contractor to address. The last we spoke he sounded doubtful that he could help ... too busy. And no longer answers my calls or returns calls. Sad and frustrating ... good luck finding a solution to your cabin problem ... if u find a good willing contractor let us know.

Share this post


Link to post
Share on other sites
delcecchi
Posted (edited)

How many footings have shifted? And what is the soil like?I

Just wondering about feasibility of a diy solution. Cook building center rents a backhoe skid steer for a reasonable price.

Edited by delcecchi

Share this post


Link to post
Share on other sites
chucker1101

Any chance you could post a couple of photos? Also, when the piers were put into place, did they pin them by drilling holes into rock and gluing re-rod?

 

My take would be to re-build foundation, and make certain to drill holes and set rerod pins, followed by concrete/cement blocks with cement down the middle of the blocks. If that was done to begin with, though, not certain what to say. 

  • Thumbs Up 1
  • Like 1

Share this post


Link to post
Share on other sites
leech~~
Posted (edited)

My Mom bought an old shell of a lake cabin up on blocks on a hill as well.  Over the years she made a bunch of improvements on the inside like added an indoor bathroom, kitchen, bed rooms and it all added tons of weight.

The cabin slowly started moving and at times I could hard get the door open to get in. One winter it moved so much the the frig that was right by the door was blocking it in the spring.

When my Dad passed away my son and I got a few 20 ton jacks and tried to level it out but it was just to far gone.

I found out when climbing under it that all the cross members were built with 2"X8" and all bowed bad. 😮

I finally got her to sell it at age 82 and let the next younger owner deal with it! 

 

 

Edited by leech~~

Share this post


Link to post
Share on other sites
PSU

Thanks for the replies friends. Here are a few pictures

Cabin shots.png

Cabin 2.png

Cabin 3.png

  • l Love It 1

Share this post


Link to post
Share on other sites
PSU

By the way and for clarification, the cabin seems very sturdy and level. Our builder agreed

Share this post


Link to post
Share on other sites
leech~~

Dang dude that is a high one.  You may think about adding a full foundation under it some time when you can afford it. Your kind of playing Jenga there! 😮

 

image.png.4b32e02dfdfc07969ec2fb5fbc743d24.png

Share this post


Link to post
Share on other sites
delcecchi
Posted (edited)
1 hour ago, PSU said:

By the way and for clarification, the cabin seems very sturdy and level. Our builder agreed

And it will be up until the pillars do a Sampson.

The design doesn't seem to have much lateral strength.  Are those foundation posts just basically sitting on the ground or rock with perhaps a pad of concrete under them?

 

Remember that, as the support leans, there is a portion of the cabin weight pushing the bottom out and top in, like standing on a ladder leaning on a wall and the more it leans the more side force.

 

I'm wondering if the bottom isn't sliding a little.  

 

I am not a construction guy, so just an wondering.

Edited by delcecchi
  • Thumbs Up 1
  • Sad 1

Share this post


Link to post
Share on other sites
Big V Bobcat
Posted (edited)

Your cabin does not appear to have any lateral support. Some of the column 'bays' between the columns should have some diagonal bracing. Right now they are all acting as independent columns and each is allowed to move/shift however mother nature and gravity wants. The connection from the top of the columns to the bottom of the cabin floor structure is a weak (pinned) connection. Think of a table with wobbly legs and a lot of weight on top of it. Like it was mentioned earlier, the footings are most likely not anchored to the bedrock, or at least down to the frost line for the region (6'-0" Deep!)

 

Heavy rains or a big snow load, coupled with some high winds could potentially be disastrous. I would probably replace the middle bay with some larger timber columns (8x8 or whatever the beam width is) and brace it diagonally - front to back and side to side. Then re-do the block columns in the front. I can't really see the back columns. It would probably be wise to consult with a structural engineer to come up with some specific details to give a contractor if you can find one to do the work.

Edited by Big V Bobcat
  • Thumbs Up 3

Share this post


Link to post
Share on other sites
chucker1101
Posted (edited)

Like everyone, i'm starting with the statement of i'm not a structural engineer, and i think it's worth your while to hire one to assess this. It can be hard to find building engineers the area sometimes. I've found that there are plenty of craftsman and engineers in Duluth area that enjoy the drive up and doing work here.  

 

First, i think you clearly have a lateral deflection issue. The base of the piers are either slipping or rotating. The basic question is how are the piers pinned to the ledge rock? If the foundation base was poured/formed directly on the ledge rock without any pinning, it's going to move. Too much level/water/ice/snow issues to stop that. Assuming some level of pinning happened, knowing how (or if) any pinning was done would be helpful to determine how fast it'll degrade. They might have used Hilti Pins, which probably aren't adequate for the Northern MN climate in this situation, but would at least help slow the issue.

 

Second, there's probably nothing you can do to correct the deflection now. So your choices are down to replacing the piers altogether, or trying to stop/slow the lateral movement. As mentioned, balancing the lateral load amongst all the piers through some type of diagonal bracing between piers, would be the best first step. Rotation or sideways deflection would be transmitted to multiple piers, and should slow the process.

 

Here's where a structural engineer might be able to help, to verify (or refute) this thought...I think you could reinforce the footings with an additional block on each side of the footings, and then pin those down really tight with a good 24" hole insertion of rebar. So for each footing, place four blocks, one on each side, do a deep pin/epoxy of each using rebar, and maybe stop the lateral slide of the original pier. It doesn't solve the current deflection, but would prevent it from getting worse. But don't take my word for it  :)  Find a good engineer.

 

Finally, for those front piers you could tear them down, put a smaller well-pinned pier in ( a couple of feet off the ground) and then use 6x6 posts to hold the porch up - a cheaper solution than full pier replacement. This is assuming the house proper is squared on the other piers. The load on the porch isn't nearly what the house load is, and 6x6 should be more than adequate for the smaller load.

 

Good luck, not fun...

Edited by chucker1101
  • Thumbs Up 1

Share this post


Link to post
Share on other sites
PSU

Really appreciate the thoughts friends. You guys are always pretty knowledgeable. First and foremost, I am as far from a handy guy as you'll find.....It's my understanding that the builder (again, very reputable) didn't go down to the frost lines or ledge rock as this was only originally going to be a bunkhouse. The footings are on top of a sort of concrete square which you cant see on the photos. He may have called them "floating footings" and told us they may move somewhat. We built the cabin in 2005 and only started to notice the "movement" back in 2015. I know the pictures look ominous, however this has been taking place over many years.

 

I am calling the excavator who helped with the footings to get a better sense of best steps moving forward as I seem to recall he excavated the land for the footings.  

Share this post


Link to post
Share on other sites
SkunkedAgain
Posted (edited)

Yup, floating footings are just in the ground. Just from the pictures it seemed easy to tell that frost heave has pushed the piers around because the footings are neither below the frost line nor pinned to the bedrock. You've certainly added more load to it so I'm not sure what liability the original builder has, but anything that you don't pin or get below the frost line is going to shift. Basements foundations are poured below the frost line to prevent this problem. When no basement is going in, something has to get down to something solid or shifting will occur.

 

A structural engineer is a good idea. However, it really comes down to the fact that the footings are inadequate and they will need to be braced/replaced before the entire place does a Jenga.

 

As a side note, I just put in a small structure on a hill. It's got 8 piers of which 6 have footers that are pinned to bedrock and the other two are just big footers that are 4.5ft deep because I never hit bedrock.

Edited by SkunkedAgain
  • Thumbs Up 3

Share this post


Link to post
Share on other sites
Skibo

I feel for you.  The really bad part for you is that the Limit of Repose (statute of limitations) for a contractor in Minnesota is 10 years, unless they intentionally build something wrong.  Very hard to prove that, but I would try.  This is not going to be a low-cost fix.  If you had an architect design this, I would definitely go after him/her.  Find a good construction attorney and buy an hour of his/her time.

Having built a number of residential and commercial buildings on some very un-level and difficult lots, I can't believe that your contractor put your house on those very high and very small piers with no means of stopping lateral shifting.  A foundation is a system that has to work as a single unit to support the structure.  Even ledge-rock moves, and there doesn't seem to be anything to keep the system together in the event of any movement.  All of those piers should have been tied together to stop movement and create a somewhat monolithic foundation.

Everyone who has posted and spent any time on or around lakes in northern MN (especially in ledge-rock country) has likely seen many examples like this of napkin-architecture and engineering.  I'm sure that a good architect or engineer can come up with a way to salvage what you have instead of needing to replace the entire foundation system.

Good luck!  https://www.revisor.mn.gov/statutes/cite/327A.02

  • Thumbs Up 1

Share this post


Link to post
Share on other sites
leech~~

What was proposed to fix my mom's cabin by a builder was they would slide steel beams under the whole cabin.

Jack it up a bit and put in a new foundation. 

I thought that she may do it, but we found out after she passed away that she was a very charitable person and had been supporting the kids at the Mille Lacs band of Ojibwe.  If you get my meaning! 🙄 

  • Thumbs Up 2
  • Sad 1
  • Like 1

Share this post


Link to post
Share on other sites
birdswacker

I see In the first picture I see shims on top of the piers?

Why is there 4”-5” of shim on the left pier”

1.5” on the center pier?

3”-4” on the right pier?

it doesn’t appear these piers are anchored to the cabin?

Get rid of the corner piers and pour  a concrete corner 4’-6’ long each way and make sure it’s anchored to something above with structural plates (Simpson plates or steel plates

just a thought??

  • Thumbs Up 2

Share this post


Link to post
Share on other sites
papadarv

Not sure about your builders material selection. Looks like 11 EA 8" cinder blocks sand/cement morter between blocks 88" tall pillars. Note the water/moisture on the block joints which degrades when frozen. Note seperation/morter loss on top blocks. On circled shims, 2 1.5" + several 1/2" jammed between looks like shabby work. On pic 2 buried rocks and small tree trunk indicate heavy rock bed ground typical in northern MN. You may have very shallow below ground footings anchored well above the frost line. Piller has already shifted about 33% out from the structure. If it goes past 50% it could collapse and other outside pillers crumble. birdswaker idea of 4'-6' poured concrete corners with footings below the frostline might be a good idea sooner than later.

20190730_084437.thumb.jpg.5930604d9cebf4f0f6f5a0d0d380f303.jpg

20190730_085140.thumb.jpg.2989ecc3595bb2f99d9150c9261d2ccd.jpg

  • Thumbs Up 1
  • Like 1

Share this post


Link to post
Share on other sites
SkunkedAgain

Share this post


Link to post
Share on other sites
delcecchi

I think maybe it is time to "out" this mystery contractor.    For everyone's well being.  

 

I'm guessing the shims are there because the pads didn't end up at the right height for an even number of cinder blocks.  He just poured them and stacked the blocks and then shimmed to get the joists level.   

The other possibility is that they sank from freeze thaw cycles with the load on them and the shims were to level the structure back up.

 

 

  • Thumbs Up 1

Share this post


Link to post
Share on other sites
PSU

Thanks for the replies everyone, I sincerely appreciate the continued feedback! I contacted our former excavator who also worked on the cabin and he (and another local builder friend I know) suggested I call an expert mason who lives in the Cook area. I have left him a message. My immediate concern is the safety hazard, i.e. is it imminent? We use the cabin quite often in the spring, summer, and fall. Actually, just got off of the phone with the mason and he's going to come out and take a look in a few weeks as he will be working in the Frazer/Smarts Bay area. He looked at the pictures and didn't feel there was an imminent safety issue. Our builder also made the same comment a month ago that we should probably have a plan in place for fall or Spring.   

  • Thumbs Up 1

Share this post


Link to post
Share on other sites
PSU

Hey Del, I sent you a PM on this board. Call when you have a moment

Share this post


Link to post
Share on other sites
delcecchi
5 hours ago, PSU said:

Hey Del, I sent you a PM on this board. Call when you have a moment

Nice to talk to you.  Good luck with getting your supports fixed.

  • Thumbs Up 1
  • Like 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




  • Your Responses - Share & Have Fun :)

    • JBMasterAngler
      Few, if any muskies down there. You’d be better off either zipping up to Lake St. Croix or getting a WI license and fishing the Chippewa River. 
    • wbriner
      Has anybody been to Big Sand lately?  Any tips as I'll be there for a week (8/26-8/30) and have never fished the lake.    Thank you in Advance!
    • Rick
      The Minnesota Department of Natural Resources (DNR) is accepting comments through Sept. 18 on an environmental assessment worksheet for a proposed mountain bike trail development, consisting of two loops, in Crow Wing County. Cuyuna Lakes Mountain Bike Crew proposes to construct a total of 11.40 miles of recreational trails, consisting of the Cuyuna Connection Trail Loop and the Cuyuna Hills Trail Loop. The trails are designed to be used for non-motorized recreation access including mountain biking, hiking, trail running, snowshoeing and cross-country skiing in the Cuyuna area. The EAW is available to review online at: http://www.dnr.state.mn.us/input/environmentalreview/cuyunacrewmtbiketrails/index.html A hard copy may be requested by calling 651-259-5115 Additionally, the EAW is available for public review at: DNR Library, 500 Lafayette Road, St. Paul, MN 55155 DNR Northeast Region Headquarters, 1201 East Highway 2, Grand Rapids, MN 55744 Hennepin County – Minneapolis Central Library, Government Documents, Second Floor, 300 Nicollet Mall, Minneapolis, MN 55401-1992 Kitchigami Regional Library, 212 Park Avenue, Pine River, MN 56474 Jessie F. Hallett Memorial Library, 101 1st Street SE, Crosby, MN 56641 Brainerd Public Library, 416 S. 5th St., Brainerd, MN 56401 The EAW notice was published in the August 19, 2019 EQB Monitor. Written comments on the EAW must be submitted no later than 4:30 p.m. on Wednesday, Sept. 18 to the attention of Cynthia Novak-Krebs, EAW Project Manager, Environmental Policy and Review Unit, DNR Division of Ecological and Water Resources, 500 Lafayette Road, St. Paul, MN 55155-4025. Electronic or email comments may be sent to [email protected] Please use “Cuyuna Connection EAW” in the subject line. Written comments may also be sent by fax to 651-296-1811. People who would like to receive a response that includes final documents should include their name and contact information. Because all comments and related information are part of the EAW public record, any submitted names and contact information will also be published and publicly available. Discuss below - to view set the hook here.
    • Rick
      The Minnesota Department of Natural Resources invites the public to attend a meeting on Oct. 21 to review proposed changes to recreational trail systems in the Rum River State Forest and nearby state forest lands. The affected lands are in Mille Lacs and Morrison counties. The meeting will be from 6 to 8 p.m. at the Onamia Lions Community Center, 806 W. Kathio St., Onamia. Proposed changes include adding 5.9 miles of off-highway motorcycle, 5.1 miles of all-terrain vehicle (class one)/off-highway motorcycle and 1.1 miles of off-road vehicle. The draft proposals reflect feedback gathered during an open house in March 2018. The forest is classified as “limited” with respect to motor vehicle use, which means that OHVs may only use forest roads and trails that are posted open. The DNR does not propose changing the “limited” classification. The DNR invites people to attend the meeting to review maps of existing and proposed trails, discuss the DNR proposals, submit comments and suggest modifications to the proposed changes. The DNR will also accept written comments through 4:30 p.m. on Nov. 4. Comments received at the meeting and during the public comment period will be used to develop a final recommendation that will be submitted to the DNR Commissioner for approval. Changes to state forest trail designations must be made by Commissioner’s order and published in the State Register. Written comments may be submitted by fax to: 651-297-1157, by email to [email protected], or by mail to: Joe Unger, DNR Parks and Trails, 500 Lafayette Rd, St. Paul, MN 55155-4039. For more information, call: The DNR Division of Parks and Trails central office in St. Paul, 651-259-5279. The DNR Division of Parks and Trails area office in Sauk Rapids, 320-223-7861. Information is also available online at mndnr.gov Discuss below - to view set the hook here.
    • Rick
      The Minnesota Department of Natural Resources is asking ruffed grouse hunters in northern Minnesota to voluntarily submit samples for a West Nile virus research project that the DNR is conducting. Researchers will test hunter-harvested birds for exposure and active infections of the disease. “We want to learn more about West Nile virus in ruffed grouse, because of concerns that it might be impacting the production of young birds, which make up a large portion of what hunters see in the fall,” said Charlotte Roy, grouse project leader with the Minnesota DNR. The adult grouse population has been cycling around a stable 10-year average. Minnesota is collaborating on this project with researchers in Wisconsin and Michigan. This is the second year of the study and results from the first year are expected from the lab early this fall. The research is partially funded by the Ruffed Grouse Society and the Game and Fish Fund. “Thank you to all our volunteers and hunters who help us collect these samples. Participation from hunters is critical to the success of the project,” Roy said. West Nile virus has been present in Minnesota since the early 2000s, and cases have been found in wild birds, people and other mammals. Birds vary in vulnerability to the virus. Some bird species recover quickly and become tolerant to the virus while others, such as blue jays and crows, suffer higher rates of mortality. A study in Pennsylvania indicated the virus could impact ruffed grouse populations when combined with habitat stresses. West Nile virus is carried by infected mosquitoes. Not all people or animals bitten by an infected mosquito will contract West Nile virus. There have been no documented cases of people contracting West Nile virus from consuming properly cooked meat. How to participate Hunters who would like to assist with the project will need to collect blood on filter paper strips within 30 minutes of harvest. They will also be asked to provide the birds’ hearts and few feathers for sex and age determination. Collection kits will be available for pickup at DNR area wildlife offices within ruffed grouse range after Labor Day on a first-come first-serve basis, and also at the regional DNR headquarters in Bemidji and Grand Rapids. Contact information for wildlife offices is available at mndnr.gov/areas/wildlife and hunters are encouraged to call before stopping. Information can also be found in the Hunting Regulations Book. This year, the Ruffed Grouse Society is offering a shotgun and Pineridge Grouse Camp is offering a guided hunt as prizes in a drawing for participating hunters that submit samples correctly. Hunters are also participating in sample collection at the Ruffed Grouse Society National Hunt in October, Pineridge Grouse Camp, Bowen Lodge, Hoot-N-Holler, and the Akeley Grouse Hunt. Private hunting guides and wildlife students at participating colleges will also contribute to reaching the desired sample size of 400 birds. Return postage and complete instructions are included in the kits. Samples also can be dropped off at Pineridge Grouse Camp near Remer. More information about ruffed grouse management can be found on the DNR website.  Questions about the West Nile virus study can be directed to Charlotte Roy at 218-328-8876 or [email protected]   Discuss below - to view set the hook here.
    • Wanderer
      That’s a dandy. 😎
    • ozzie
      got out for a couple hours on Friday from 8pm to 10pm.  Started jig rapping on a now popular spot on middle WF and only wasted 15-20 minutes doing that before we started trolling over the deep water.  We went into Trout and trolled all the way across the lake landing 2 17.25" walleyes. One on the west side over 70' of water and the other on the east side over 120' of water.  Once again just a beautiful evening on a beautiful chain of lakes!!
    • VermilionGold
      Good bite in the East end this weekend.  No big ones but lots of eater size walleyes coming to the boat.  Even got a bonus chewy, gave my seven year old all he could handle!  
    • Wanderer
    • Muskies
      Here a picture taken by Becky Nelson from Intl Falls facing north towards Fort Frances around 8pm...