Jump to content
  • GUESTS

    If You  want access  to member only forums on FM, You will need to Sign-in or  Sign-Up now .

    This box will disappear once you are signed in as a member.

Is Cass lake behind schedule??


Recommended Posts

Regarding walleyes- Like most other lakes I've fished this year I can only assume that Cass is the exact same way. Some of my favorite local lakes are about 3 weeks behind schedule with the late ice out and are ON FIRE like they normally are in late May to mid June. I expect these lakes to stay hot for another week or two at least.

I would think Cass will still be really good all the way into July and maybe even mid july. Do you think I am I wrong or right?

Link to comment
Share on other sites

  • 'we have more fun' FishingMN Creators

Cass is pretty slow right now. Shines and crawlers seem to be the best bet. Only 3 weeks. or so behind.

Link to comment
Share on other sites

That's great to hear.. and exactly what I meant. Cass typically gets going in early-mid June right.... SO July should be smokin'!

Link to comment
Share on other sites

A good friend from high school fished Cass this weekend, and he said it was red hot. Your mileage may vary, I guess.

Link to comment
Share on other sites

I'll second the red hot! I know a dad and his 10 y/o son that were pretty happy with their limit in less than 3 hours Sat. AM.

Link to comment
Share on other sites

Going to fish Cass for the first time this weekend. Are the fish on a shore line bit or deeper water humps and structure? Just a little info would be great help.

Link to comment
Share on other sites

  • 'we have more fun' FishingMN Creators

Last few days found fish on both shoreline and humps. Crawwlers seemed to work better than leeches or minnows. Big bug hatch seemed to slow down a bit today. Early morning bite has been pretty good the past few days. If bite gets tougher later in the day the slow death rig seemed to put fish in the boat pretty regularly.

Link to comment
Share on other sites

Does anyone know the water temp from this past weekend?

Slow death can be fun stuff!

Link to comment
Share on other sites

I just talked to a friend who is up there right now. He had temps at 70-71 degrees. Borch, not heard of a slow death rig. Can you elaborate?

Shallow Runner

Link to comment
Share on other sites

Slow death is a live bait rig for crawlers that simply spins the crawler. I like it with gulp crawlers. Very simple rig with only the special hook, snell, 2 swivels with one being a ball-bearing swivel to prevent line twist which can get really really bad if its not set up right

Link to comment
Share on other sites

  • 'we have more fun' FishingMN Creators

Slow death is a live bait rig for crawlers that simply spins the crawler. I like it with gulp crawlers. Very simple rig with only the special hook, snell, 2 swivels with one being a ball-bearing swivel to prevent line twist which can get really really bad if its not set up right

Nailed it. I like half a gulp crawler, (tail section) for this rig as well. Mustad sells the slow death hook. I lile to pull mine on a bottom bouncer from .6- 1.2 mph depending on the fishes mood.

Link to comment
Share on other sites

  • 'we have more fun' FishingMN Creators

Spinner rigs worked well at times before the mayfly hatch. So I'd guess it will continue to be more and more effective as water temps warm.

Link to comment
Share on other sites

  • 2 weeks later...

Report from last week: Daytime bite, tough as nails (as suspected). Some fish were caught on jigs,, some on slowdeath,, nothing on lindys. Night bite was average. A handful of keepers for each time out (usually about an hour and a half long trip) with a handful of 12" throwbacks. Fairly steady action with a fish every 10-15 minutes or so. Firetiger, yellow, and blue #5 raps produced. It seemed like the best time to be out was the standard 9-11 pm. good times.

Link to comment
Share on other sites

gonna be up there later this week (thurs july 11). any tips on depth during day vs depth during eve/night would b appreciated. also anyone know what the thermocline is out on cass.

thanks!

Link to comment
Share on other sites

gonna be up there later this week (thurs july 11). any tips on depth during day vs depth during eve/night would b appreciated. also anyone know what the thermocline is out on cass.

thanks!

5-8 FOW at night... They were in 12-14 during the day last week.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Your Responses - Share & Have Fun :)

    • smurfy
      is 3 weeks away............who's going and where???? i skip the first week and i'll head up to the cabin the 2nd week.  ussually fish smaller lakes. 
    • jparrucci
      Very low, probably 2 feet lower than last year at ice out.
    • mbeyer
      what do they look like this spring?
    • SkunkedAgain
      I might have missed a guess, but here are the ones that I noted:   JerkinLips – March 27th, then April 7th Brianf. – March 28th Bobberwatcher – April…. MikeG3Boat – April 10th SkunkedAgain – early April, then April 21st   Definitely a tough year for guesses, as it seemed to be a no-brainer early ice out. Then it got cold and snowed again.
    • mbeyer
      MN DNR posted April 13 as Ice out date for Vermilion
    • Brianf.
      ^^^45 in the morning and 47 in the evening
    • CigarGuy
      👍. What was the water temp in Black Bay? Thanks....
    • Brianf.
      No, that wasn't me.  I drive a 621 Ranger. 
    • CigarGuy
      So, that was you in the camo lund? I'm bummed, I have to head back to the cities tomorrow for a few days, then back up for at least a few weeks. Got the dock in and fired up to get out chasing some crappies till opener!
    • LakeofthewoodsMN
      On the south end...   Lots of ice on the main basin, but it is definitely deteriorating.  Some anglers have been fishing the open water at the mouth of the Rainy River in front of the Lighthouse Gap.  The rest of the basin is still iced over. Pike enthusiasts caught some big pike earlier last week tip up fishing in pre-spawn areas adjacent to traditional spawning areas.  8 - 14' of water using tip ups with live suckers or dead bait such as smelt and herring has been the ticket.  Ice fishing for all practical purposes is done for the year. The focus for the basin moving forward will be pike transitioning into back bays to spawn,  This is open water fishing and an opportunity available as the pike season is open year round on Lake of the Woods. The limit is 3 pike per day with one being able to be more than 40 inches. All fish 30 - 40 inches must be released. With both the ice fishing and spring fishing on the Rainy River being so good, many are looking forward to the MN Fishing Opener on Saturday, May 11th.  It should be epic. On the Rainy River...  An absolutely incredible week of walleye and sturgeon fishing on the Rain Rainy River.     Walleye anglers, as a rule, caught good numbers of fish and lots of big fish.  This spring was one for the books.   To follow that up, the sturgeon season is currently underway and although every day can be different, many boats have caught 30 - 40 sturgeon in a day!  We have heard of fish measuring into the low 70 inch range.  Lots in the 60 - 70 inch range as well.   The sturgeon season continues through May 15th and resumes again July 1st.   Oct 1 - April 23, Catch and Release April 24 - May 7, Harvest Season May 8 - May 15, Catch and Release May 16 - June 30, Sturgeon Fishing Closed July 1 - Sep 30, Harvest Season If you fish during the sturgeon harvest season and you want to keep a sturgeon, you must purchase a sturgeon tag for $5 prior to fishing.    One sturgeon per calendar year (45 - 50" inclusive, or over 75"). Most sturgeon anglers are either a glob of crawlers or a combo of crawlers and frozen emerald shiners on a sturgeon rig, which is an 18" leader with a 4/0 circle hook combined with a no roll sinker.  Local bait shops have all of the gear and bait. Up at the NW Angle...  Open water is continuing to expand in areas with current.  The sight of open water simply is wetting the pallet of those eager for the MN Fishing Opener on May 11th.   A few locals were on the ice this week, targeting pike.  Some big slimers were iced along with some muskies as well.  If you like fishing for predators, LOW is healthy!  
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.